Storage King Project 2.0
Comprehensive mechanical services upgrade for Sydney's premier storage and logistics hub, ensuring peak climate control and system longevity.
Client
Storage King Australia
Sector
Storage & Logistics
Locations
Mascot, NSW
Services
HVAC Design & Construct
The Challenge
Storage King's Mascot facility required a sophisticated mechanical ventilation and climate control strategy capable of managing high-density storage environments across massive floor plates. Technical challenges included strict temperature stability requirements for sensitive inventory and the operational complexity of integrating new HVAC systems into an active, high-traffic commercial development without interrupting daily site logistics.
The Solution
HVAC Industries delivered an engineering-led mechanical design featuring high-efficiency Daikin VRV systems paired with custom-fabricated ductwork suitable for open-plan plant rooms. Our delivery approach utilized a phased installation schedule to accommodate ongoing site works. The solution included a fully integrated Building Management System (BMS) to provide real-time monitoring and redundancy, ensuring consistent environmental performance and long-term energy efficiency targets were met.
Project Gallery
Technical Highlights
Total Capacity
1.2MW High-Efficiency Chilled Water System
Redundancy Code
N+1 Mechanical Redundancy for 24/7 Reliability
Advanced Controls
Integrated BMS with Real-time Energy Monitoring
System Efficiency
30% Lower Energy Index vs. Baseline Standards
“The HVAC Industries team transformed our facility’s environment. Their engineering precision and commitment to technical excellence ensured a seamless installation that has significantly improved our operational efficiency and climate control.”
Storage King Mascot Development
Operations Director
Ready to elevate your facility's performance?
Contact HVAC Industries today to discuss technical solutions and mechanical design strategies for your next project.