Salt Apartments

Mechanical Services Design & Construct
Status: Completed – February 2026

salt apartments.png

The Salt Apartments development is a high-end residential project located in the Port Macquarie region, approximately five hours from HVAC Industries’ headquarters. Due to the project’s regional location and the advanced stage of construction, the developer experienced difficulty securing a mechanical contractor capable of delivering the works within the required timeframe.

 

HVAC Industries was recommended to the client through our strong industry partnerships and reputation for delivering complex mechanical projects under tight timeframes. At the time of engagement, the building structure was approaching the top-out stage, creating significant time pressure for mechanical services installation.

 

Demonstrating HVAC Industries’ commitment to client service and project delivery, our team responded rapidly to the opportunity:

• The project was priced and tendered immediately by our estimating team

• The contract was reviewed and executed within 48 hours of receiving the tender documentation

• Design & Construct shop drawings were submitted within 96 hours

• HVAC Industries mobilised to site within five days of engagement

 

This rapid mobilisation highlights HVAC Industries’ ability to deliver efficient procurement, fast-track design coordination, and accelerated construction programs when required.

 

The development consists of 15 high-end residential apartments, where architectural quality and attention to detail were a key priority for the client. HVAC Industries worked closely with the design team and trades to ensure the mechanical installation aligned with the project’s architectural standards and interior design requirements.

 

HVAC Industries successfully delivered the project to a high standard, exceeding the client’s expectations in both installation quality and project delivery, and was proud to be among the first contractors to complete commissioning and handover on the project.
 

Project Scope

The project involved a full design and installation of mechanical services, including air conditioning, mechanical ventilation, and commissioning works.

Commissioning & Compliance

• Full system air balancing and performance testing

• System commissioning to verify compliance with design intent

• Preparation and delivery of O&M manuals

• Provision of as-built drawings and documentation

• Installation works covered by a 24-month defect liability period

All works completed in compliance with NCC requirements and AS1668 standards

Installation Standards & Quality Assurance

Exhaust ventilation systems for toilets, laundries, and kitchens across all apartments

Lobby ventilation system incorporating outside air supply with roof-mounted fans

 

Car park ventilation system including:

• Supply and exhaust fans

• Jet fan system

• CO sensor-controlled VSD operation

• Full compliance with AS1668 ventilation standards

 

Ventilation systems installed for:

• Plant rooms

• Utility rooms

• Fire pump rooms

Precision Cooling Systems

• Installation of 15 VRF ducted air conditioning systems servicing all residential apartments

• Installation of over 75 indoor fan coil units across the development

• Installation of linear bar grilles and integrated architectural grilles within joinery and ceiling spaces

• Close coordination with joinery and architectural trades to achieve optimal grille placement while maintaining architectural aesthetics

• Installation of ductwork, insulation, refrigeration piping, and control systems

• Installation of VRF condenser units located on apartment balconies

Project Outcome
HVAC Industries has developed a strong reputation for delivering mechanical services projects in regional areas and under accelerated construction programs. Our ability to rapidly mobilise design, procurement, and construction teams enables us to successfully deliver projects where tight timelines and logistical challenges may prevent other contractors from participating. Projects such as Salt Apartments, Port Macquarie demonstrate HVAC Industries’ ability to step into complex situations and deliver high-quality mechanical services solutions under demanding time frames, while maintaining full compliance with NCC requirements, Australian Standards, and client expectations.