Parliament House VIC

Legislative Council Table Offices – Mechanical & BMS Upgrade
Status: Completed – May 2024

Vicparliament2024_b.jpg

HVAC Industries was engaged to deliver the mechanical services and building management system upgrade for the Legislative Council Table Offices within Parliament House Victoria. The project required a contractor capable of delivering high-precision mechanical works within a sensitive government environment, while maintaining exceptional documentation standards and coordination with existing building infrastructure.

 

HVAC Industries was selected based on our extensive experience in complex commercial mechanical services projects and our industry-leading level of technical documentation, which often exceeds the standards typically produced by Tier 1 and Tier 2 mechanical contractors.

 

At HVAC Industries, we pride ourselves on delivering not only high-quality installations, but also comprehensive, accurate, and client-aligned documentation. Our engineering and administration teams carefully adapt our documentation structure to match each client’s internal systems, including document numbering, filing protocols, and compliance requirements—a critical factor when working within environments such as Parliament House Victoria.

Project Scope

HVAC Industries delivered a complete mechanical and control system upgrade including:

• Installation of new Daikin VRF air conditioning systems across two levels of the Legislative Council offices

• Integration of the VRF system with the existing centralised control system

• Installation of under-desk heating panels to improve occupant comfort within workspace areas

• Design and installation of a dedicated ventilation system for heat extraction in the printer room

• Temperature-controlled ventilation system using automated sensors

• Full integration of mechanical systems into the Building Management System (BMS)

• Commissioning and optimisation of BMS controls and monitoring systems

• Updated BMS graphics and system interface for facility management

• Final testing, balancing, and commissioning to ensure full compliance with project design intent

Project Outcome
The completed upgrade delivered a fully integrated mechanical and control solution that improved occupant comfort, system reliability, and operational monitoring. The project demonstrates HVAC Industries’ capability to successfully deliver technically complex mechanical upgrades within high-profile government facilities, while maintaining exceptional engineering standards, documentation accuracy, and commissioning quality.

“By far, this is the best documentation package we have received from a subcontractor. Everything matched the project requirements perfectly and made the review process straightforward and efficient.”