Moss Vale Data Centre

Mechanical Services Installation – Critical Cooling Infrastructure

Status: Completed – June 2025

moss vale data centre.jpg

Project Scope

HVAC Industries was engaged by Programmed Electrical Technologies Pty Ltd to deliver the mechanical services installation for the Moss Vale Data Centre, focusing on the installation of critical cooling infrastructure required to support the facility’s IT environments.
 

Data centre facilities require highly reliable mechanical systems capable of maintaining stable environmental conditions, redundancy, and continuous operational performance. HVAC Industries worked closely with the client and project stakeholders to ensure all cooling infrastructure was installed in accordance with the project specifications, commissioning procedures, and operational requirements associated with data centre environments.
 

The project involved the installation and commissioning of precision cooling systems, ensuring that temperature and humidity conditions within the server rooms could be maintained within strict operating tolerances.

Commissioning & Compliance

• Full system air balancing and performance testing

• System commissioning to verify compliance with design intent

• Preparation and delivery of O&M manuals

• Provision of as-built drawings and documentation

• Installation works covered by a 24-month defect liability period

All works completed in compliance with NCC requirements and AS1668 standards

Installation Standards & Quality Assurance

Exhaust ventilation systems for toilets, laundries, and kitchens across all apartments

Lobby ventilation system incorporating outside air supply with roof-mounted fans

 

Car park ventilation system including:

• Supply and exhaust fans

• Jet fan system

• CO sensor-controlled VSD operation

• Full compliance with AS1668 ventilation standards

 

Ventilation systems installed for:

• Plant rooms

• Utility rooms

• Fire pump rooms

Precision Cooling Systems

Upon completion of installation works, HVAC Industries carried out full commissioning procedures including:

• System testing and verification in accordance with ITP documentation

• Refrigerant system pressure testing and leak verification

• Performance verification of the cooling systems

• Preparation and delivery of as-built documentation and O&M manuals

• Final inspection and certification of installed systems

All works were completed in accordance with the approved design documentation and mechanical specifications for the facility.

Critical Infrastructure & Data Centre Cooling
HVAC Industries has developed proven capability in delivering mechanical services installations for critical infrastructure environments, including data centres and facilities requiring precision cooling systems. These environments demand mechanical systems that maintain stable temperature, humidity control, and continuous operational reliability to support sensitive IT infrastructure and electronic equipment. HVAC Industries understands the importance of precision installation, system redundancy, and strict commissioning procedures required for these facilities. Our team works closely with builders, electrical contractors, and technology integrators to ensure that cooling systems are installed in accordance with design documentation, commissioning procedures, and project-specific inspection and testing plans (ITPs). HVAC Industries focuses on delivering installations that provide long-term operational reliability, ensuring that mechanical systems supporting critical equipment perform consistently under continuous operating conditions.

Key Capabilities
HVAC Industries’ capabilities within critical infrastructure and data centre environments include:
• Installation of precision cooling systems for server rooms and IT facilities
• Installation of DX refrigeration piping systems for precision air conditioning units
• Installation of Vertiv and other data centre cooling systems
• Refrigerant pipework installation and insulation in accordance with BCA requirements
• Installation of condensate drainage systems and humidification connections
• Installation of sheet metal trunking and mechanical containment systems
• Integration of cooling infrastructure within electrical and IT service environments
• Coordination of mechanical systems with electrical contractors and data infrastructure installers
• Compliance with project Inspection and Test Plans (ITP) and commissioning procedures
• Pressure testing, leak testing, and system verification
• Preparation of O&M manuals, commissioning reports, and as-built documentation

Project Outcome
HVAC Industries successfully delivered the mechanical installation works for the Moss Vale Data Centre, providing a reliable cooling infrastructure capable of supporting critical IT environments. The project demonstrates HVAC Industries’ ability to deliver precision mechanical installations within data centre environments, where reliability, installation accuracy, and strict compliance with commissioning procedures are essential. The project was completed with full commissioning, certification, and includes a 12-month defect liability period, ensuring continued reliability and operational performance of the installed systems.